Rapid Excavation and Tunneling Conference 2015 proceedings

Saved in:
Bibliographic Details
Corporate Author: Rapid Excavation and Tunneling Conference
Other Authors: Johnson, Mark (Editor), Oginski, Shemek, (Editor)
Format: eBook
Language: English
Published: Englewood, Colorado : Society for Mining Metallurgy & Exploration, 2015.
Subjects:
ISBN: 9780873354165
0873354168
9781680156898
1680156896
0873354141
9780873354141
Physical Description: 1 online resource (1,410 pages) : illustrations (some color)

Cover

Table of contents

LEADER 05253cam a2200517 i 4500
001 kn-ocn912324866
003 OCoLC
005 20240717213016.0
006 m o d
007 cr cn|||||||||
008 150622t20152015coua ob 101 0 eng d
040 |a E7B  |b eng  |e rda  |e pn  |c E7B  |d OCLCO  |d EBLCP  |d OCLCO  |d KNOVL  |d OCLCO  |d YDXCP  |d OCLCF  |d OCLCO  |d OCLCQ  |d UAB  |d MERUC  |d OCLCQ  |d N$T  |d OCLCQ  |d STF  |d AU@  |d OCLCQ  |d OCL  |d OCLCQ  |d K6U  |d UX1  |d OCLCQ  |d OCLCO  |d OCLCQ  |d UPM  |d OCLCQ  |d OCLCO  |d OCLCL 
020 |a 9780873354165  |q (electronic bk.) 
020 |a 0873354168  |q (electronic bk.) 
020 |a 9781680156898  |q (electronic bk.) 
020 |a 1680156896  |q (electronic bk.) 
020 |a 0873354141 
020 |a 9780873354141 
020 |z 9780873354141 
035 |a (OCoLC)912324866  |z (OCoLC)910447029  |z (OCoLC)1151922052 
111 2 |a Rapid Excavation and Tunneling Conference  |d (2015) 
245 1 0 |a Rapid Excavation and Tunneling Conference 2015 proceedings /  |c edited by Mark C. Johnson and Shemek Oginski. 
264 1 |a Englewood, Colorado :  |b Society for Mining Metallurgy & Exploration,  |c 2015. 
264 4 |c ©2015 
300 |a 1 online resource (1,410 pages) :  |b illustrations (some color) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references at the end of each chapters and index. 
505 0 |a Cover; Title Page; Copyright; Contents; Preface; Executive Committee; Session Chairs; International Committee; Part 1: Caverns and Large Spans; Holmestrand Underground Railway Station from Vision to Reality; New York City Grand Central Subway Station Planned Modifications and Improvements; Second Avenue Subway Project: Design and Construction of Large Cavern Final Linings and Penetrations at 86th Street Station; Roof Displacements in Pump Station Cavern in the Chagrin Shale; St. Louis' Sewer Tunnel Vision; Part 2: Contracting Practices. 
505 8 |a I-70 Twin Tunnels Widening Using Drill and Blast Under CM/GC ContractSupport of Excavation for Roosevelt Station: Successful Partnering Overcomes Challenging Construction Change; Seattle Light Rail Tunnels Quality Control and Assurance: Stakeholder Collaboration Delivers Successful Project; Integrated Design Process for First Street Tunnel; Partnering Through Risk Management: Lake Mead Intake No. 3 Risk Management Approach; Construction-You Need Risk-Based Cost Estimating; Part 3: Design and Planning I. 
505 8 |a Critical Connections: Planning and Preparation Needed for the Eastside Access Project's Westbound Bypass Jacked Shield TunnelSouth Hartford CSO Tunnel and Pump Station; High Speed Two (HS2)-General Overview of Project with Focus on Tunnelling Challenges; Evolution of Large-Diameter TBM Road Tunnel Design; Project Configuration and Design Challenges for the City of Ottawa Combined Sewage Storage Tunnel Project; Modelling of Ground Deformation Control Induced by Slurry Shield Tunnelling; Part 4: Design and Planning II. 
505 8 |a Continuing a Legacy of Large-Diameter Hard Rock Tunneling in Chicago-The Des Plaines Inflow TunnelElements of the Istanbul Strait Highway Tunnel; Design and Construction Considerations for the Blacklick Creek Sanitary Interceptor Sewer Project in Franklin County, Ohio; Deep Tunnel Pump Station-Design/Construction; Decision Process and Criteria for Selection of a Preferred Tunnelling Method; Part 5: Design-Build Projects; Urban Challenges of the Downtown Los Angeles Regional Connector Tunnel Project; Concrete Operations at the 86th Street Station for the 2nd Avenue Subway Line. 
505 8 |a PPP Mode for Procurement of Lines 2 and 4 of Lima MetroUnique Characteristics of the Design and Construction of the Second Midtown Tunnel in Hampton Roads, Virginia; Practical Aspects of Final Design Development Using Design-Build Procurement; The Planning and Procurement Process of the Northeast Boundary Tunnel (NEBT) Project: DC Water-District of Columbia; Part 6: Difficult Ground; Challenges and Methods Utilized to Excavate Rock for an Escalator Incline Through a Luxury High-Rise Building in Manhattan. 
506 |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty 
590 |a Knovel  |b Knovel (All titles) 
650 0 |a Excavation  |v Congresses. 
650 0 |a Tunneling  |v Congresses. 
650 0 |a Underground construction  |v Congresses. 
655 7 |a elektronické knihy  |7 fd186907  |2 czenas 
655 9 |a electronic books  |2 eczenas 
700 1 |a Johnson, Mark  |q (Mark C.),  |e editor.  |1 https://id.oclc.org/worldcat/entity/E39PCjGqvhbbXxt9JvBfJP8jYP 
700 1 |a Oginski, Shemek,  |e editor. 
776 0 8 |i Print version:  |a Rapid Excavation and Tunneling Conference (2015).  |t Rapid Excavation and Tunneling Conference 2015 proceedings.  |d Englewood, Colorado : Society for Mining Metallurgy & Exploration, ©2015  |h xv, 1387 pages  |z 9780873354141 
856 4 0 |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpRETCP035/rapid-excavation-and?kpromoter=marc  |y Full text 
856 4 0 |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpRETCP055/rapid-excavation-and?kpromoter=marc  |y Full text