Guidelines for evaluating process plant buildings for external explosions, fires, and toxic releases.

"Siting of permanent and temporary buildings in process areas requires careful consideration of potential effects of explosions and fires arising from accidental release of flammable materials. This book, which updates the 1996 edition, provides a single-source reference that explains the Ameri...

Full description

Saved in:
Bibliographic Details
Corporate Author: American Institute of Chemical Engineers. Center for Chemical Process Safety.
Format: eBook
Language: English
Published: Hoboken, N.J. : Wiley, ©2012.
Edition: 2nd ed.
Subjects:
ISBN: 9781118312995
1118312996
9781621980254
1621980251
9781118312964
1118312961
9781118312988
1118312988
9780470643679
0470643676
9781283941181
128394118X
Physical Description: 1 online resource (xxvi, 204 pages) : illustrations

Cover

Table of contents

LEADER 06639cam a2200541 a 4500
001 kn-ocn798698967
003 OCoLC
005 20240717213016.0
006 m o d
007 cr cn|||||||||
008 120710s2012 njua ob 001 0 eng d
040 |a DG1  |b eng  |e pn  |c DG1  |d OCLCO  |d CUS  |d MYG  |d YDXCP  |d KNOVL  |d ZCU  |d OCLCQ  |d E7B  |d CDX  |d IDEBK  |d KNOVL  |d OCLCF  |d OCLCQ  |d COO  |d KNOVL  |d TEFOD  |d EBLCP  |d OCLCQ  |d DEBBG  |d AZK  |d DG1  |d UAB  |d COCUF  |d MOR  |d LIP  |d PIFAG  |d OCLCQ  |d U3W  |d OCLCQ  |d STF  |d WRM  |d NRAMU  |d INT  |d VT2  |d OCLCQ  |d WYU  |d UWO  |d OCLCQ  |d UHL  |d UKAHL  |d OCLCQ  |d UKCRE  |d VLY  |d LUN  |d UKUAL  |d OCLCQ  |d VHC  |d OCLCO  |d OCLCQ  |d OCLCO  |d OCLCQ  |d OCLCL  |d SXB 
020 |a 9781118312995  |q (electronic bk.) 
020 |a 1118312996  |q (electronic bk.) 
020 |a 9781621980254  |q (electronic bk.) 
020 |a 1621980251  |q (electronic bk.) 
020 |a 9781118312964  |q (electronic bk.) 
020 |a 1118312961  |q (electronic bk.) 
020 |a 9781118312988  |q (electronic bk.) 
020 |a 1118312988  |q (electronic bk.) 
020 |z 9780470643679  |q (hardback) 
020 |z 0470643676  |q (hardback) 
020 |z 9781283941181 
020 |z 128394118X 
035 |a (OCoLC)798698967  |z (OCoLC)796092157  |z (OCoLC)824350689  |z (OCoLC)961516328  |z (OCoLC)962633756  |z (OCoLC)988522419  |z (OCoLC)992039772  |z (OCoLC)992924147  |z (OCoLC)1037717281  |z (OCoLC)1038657300  |z (OCoLC)1045493677  |z (OCoLC)1055372125  |z (OCoLC)1065673491  |z (OCoLC)1069645842  |z (OCoLC)1081260311  |z (OCoLC)1113016093  |z (OCoLC)1153557062  |z (OCoLC)1162037154  |z (OCoLC)1193431638  |z (OCoLC)1228594273  |z (OCoLC)1290070469  |z (OCoLC)1303440953 
110 2 |a American Institute of Chemical Engineers.  |b Center for Chemical Process Safety. 
245 1 0 |a Guidelines for evaluating process plant buildings for external explosions, fires, and toxic releases. 
250 |a 2nd ed. 
260 |a Hoboken, N.J. :  |b Wiley,  |c ©2012. 
300 |a 1 online resource (xxvi, 204 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
500 |a Revised edition of: Guidelines for evaluating process plant buildings for external explosions and fires. c1996. 
504 |a Includes bibliographical references and index. 
505 0 |a Front Matter -- Introduction -- Management Overview -- Determining The Scope of the Building Siting Evaluation -- Building Siting Evaluation Criteria -- Explosion Hazards -- Fire Hazards Assessment -- Toxic Hazards Assessment -- Frequency and Probability Assessment -- Risk Assessment -- Mitigation Plans and Ongoing Risk Management -- Managing the Building Siting Process -- References -- Index. 
506 |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty 
520 |a "Siting of permanent and temporary buildings in process areas requires careful consideration of potential effects of explosions and fires arising from accidental release of flammable materials. This book, which updates the 1996 edition, provides a single-source reference that explains the American Petroleum Institute (API) permanent (752) and temporary (753) building recommended practices and details how to implement them. New coverage on toxicity and updated standards are also highlighted. Practical and easy-to-use, this reliable guide is a must-have for implementing safe building practices"--Provided by publisher. 
505 0 |a Machine generated contents note: 1. Introduction 1 1.1 Objective 4 1.2 Building Siting Evaluation Process 5 1.3 Selection of Approach 6 1.4 Background 6 1.5 Phillips, Pasadena, Texas USA: Propylene HDPE Unit VCE ad BLEVEs 10 1.6 Evolution of Design and Siting Practices for Buildings in Process Plants 18 1.7 Organization of the Book 20 2. Management Overview 21 2.1 Process Overview 21 2.2 Management Responsibilities under API RP-752 and API RP-753 27 3. Determining the Scope of the Building Siting Evaluation 31 3.1 Introduction 31 3.2 Buildings Considered 31 3.3 Scenario Selection 36 4. Building Siting Evaluation Criteria 45 4.1 Introduction 45 4.2 Occupant Vulnerability 46 4.3 Criteria for Existing Buildings Exposed to Explosion Hazards 48 4.4 Criteria for Fires 58 4.5 Criteria for Toxic Exposures 62 4.6 Criteria for Building Upgrades and New Buildings 64 4.7 Risk Criteria 65 5. Explosion Hazards 71 5.1 Introduction 71 5.2 Select Explosion Approach 72 5.3 Modeling and Quantifying and Explosion Hazards 74 5.4 Building Response to Explosion Hazards 78 5.5 Occupant VULNERABILITY to Explosion Hazards 90 5.6 Actions Required at the Completion of the Evaluation 90 6. Fire Hazards Assessment 93 6.1 Introduction 93 6.2 Determining if a Fire Hazard Exists 97 6.3 Spacing Table Approach 97 6.4 Performing a Consequence-Based or Risk-Based building siting evaluation for Fire 99 6.5 Occupant Response to Fire Hazards 105 6.6 Defining the Fire Protection Concept 106 7. Toxic Hazards Assessment 109 7.1 Introduction 109 7.2 Determining if a Toxic Hazard Exists 109 7.3 Building siting evaluation for toxics 111 7.4 Defining the Toxic Protection Concept 120 7.5 Evacuation vs. Sheltering-In-Place 120 8. Frequency and Probability Assessment 125 8.1 Introduction 125 8.2 Developing a Scenario List 127 8.3 Calculation of Frequency .of Initiating Event or accident 129 8.4 Probability and Frequency of Final Outcomes 144 8.5 Unit-Based Outcome Frequencies 149 9. Risk Assessment 151 9.1 Introduction 151 9.2 Risk Measure Types 154 9.3 Calculating Risk 158 9.4 Interpretation and Use of Risk Measures 169 10. Mitigation Plans and Ongoing Risk Management 171 10.1 Development of Mitigation Plans 171 10.2 Building Modifications 177 11. Managing the Building Siting Process 185 11.1 Management of Change 185 11.2 Documentation Requirements 187 11.3 Documentation of Mitigation Systems Criteria and Performance 188 11.4 Maintaining Documentation "EverGreen" 189. 
590 |a Knovel  |b Knovel (All titles) 
650 0 |a Chemical plants  |x Fires and fire prevention. 
650 0 |a Explosions. 
650 0 |a Chemical plants  |x Risk assessment. 
650 0 |a Hazardous wastes. 
655 7 |a elektronické knihy  |7 fd186907  |2 czenas 
655 9 |a electronic books  |2 eczenas 
776 0 8 |i Print version:  |a American Institute of Chemical Engineers. Center for Chemical Process Safety.  |t Guidelines for evaluating process plant buildings for external explosions, fires, and toxic releases.  |b 2nd ed.  |d Hoboken, N.J. : Wiley, ©2012  |z 9780470643679  |w (DLC) 2011049805  |w (OCoLC)711044725 
856 4 0 |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpGEPPBE01/guidelines-for-evaluating?kpromoter=marc  |y Full text