Formulas and calculations for drilling, production, and workover : all the formulas you need to solve drilling and production problems
A quick reference for day-to-day work out on the rig or a handy study guide for drilling and well control certification courses, Formulas and Calculations for Drilling, Production and Workover has served a generation of oilfield professionals throughout their careers. Compact and readable, Formulas...
Saved in:
| Main Author | |
|---|---|
| Other Authors | , |
| Format | Electronic eBook |
| Language | English |
| Published |
Burlington :
Elsevier Science,
2011.
|
| Edition | 3rd ed. |
| Subjects | |
| Online Access | Full text |
| ISBN | 9781856179300 1856179303 |
| Physical Description | 1 online resource : illustrations, char |
Cover
| LEADER | 00000cam a2200000Mi 4500 | ||
|---|---|---|---|
| 001 | kn-ocn759807498 | ||
| 003 | OCoLC | ||
| 005 | 20240717213016.0 | ||
| 006 | m o d | ||
| 007 | cr cn||||||||| | ||
| 008 | 111107s2011 vtuad of 001 0 eng d | ||
| 040 | |a EBLCP |b eng |e pn |c EBLCP |d OCLCQ |d YDXCP |d TEFOD |d N$T |d OCLCQ |d KNOVL |d OCLCQ |d DEBSZ |d KNOVL |d UKDOC |d OCLCQ |d KNOVL |d AU@ |d TEFOD |d OCLCQ |d LIP |d ESU |d OCLCQ |d BUF |d OCLCQ |d OCLCF |d CEF |d RRP |d OCL |d OCLCQ |d ERF |d OCLCQ |d OCLCO |d OCLCQ |d OCLCO |d OCLCL | ||
| 020 | |a 9781856179300 |q (electronic bk.) | ||
| 020 | |a 1856179303 |q (electronic bk.) | ||
| 035 | |a (OCoLC)759807498 |z (OCoLC)813881579 | ||
| 100 | 1 | |a Lyons, William C. | |
| 245 | 1 | 0 | |a Formulas and calculations for drilling, production, and workover : |b all the formulas you need to solve drilling and production problems / |c William C. Lyons, Tom Carter and Norton J. Lapeyrousse. |
| 250 | |a 3rd ed. | ||
| 260 | |a Burlington : |b Elsevier Science, |c 2011. | ||
| 300 | |a 1 online resource : |b illustrations, char | ||
| 336 | |a text |b txt |2 rdacontent | ||
| 337 | |a computer |b c |2 rdamedia | ||
| 338 | |a online resource |b cr |2 rdacarrier | ||
| 500 | |a Includes index. | ||
| 505 | 0 | |6 880-01 |a Cover image; Table of Contents; Front matter; Copyright; Preface; Chapter One. Basic Equations; 1.0. Terminology; 1.1. Mud Weight MW (lb/ft3), Mud Weight MW (ppg), and Specific Gravity (SG) [USCS/British]; 1.2. Density? (kg/m3 or kg/liter), Mud Weight MW (N/m3 or N/liter), and Specific Gravity (SG) [SI-Metric]; 1.3. Hydrostatic Pressure (P) and (p) [USCS/British]; 1.4. Hydrostatic Pressure (P) and (p) [SI-Metric]; 1.5. Pressure Gradient? (psi/ft), G (ppg) [USCS/British]; 1.6. Pressure Gradient G (SG) [SI-Metric]; 1.7. Equivalent Circulating "Density" ECD (ppg) [USCS/British]. | |
| 505 | 8 | |a 1.8. Equivalent Circulating "Density" ECD (N/liter) and ECD (SG) [SI-Metric]1.9. Mud Pump Output Q (bbl/stk) and q (gpm) [USCS/British]; 1.10. Capacity Formulas; 1.11. Annular Velocity Van (ft/min); 1.12. Strokes per Minute (SPM) Required for a Given Annular Velocity; 1.13. Control Drilling; 1.14. Buoyancy Factor (BF); 1.15. Decrease When Pulling Pipe Out of the Hole; 1.16. Loss of Overbalance Due to Falling Mud Level; 1.17. Circulating Hydraulic Horsepower (HHP); 1.18. Pump Pressure/Pump Stroke Relationship (the Roughneck's Formula); 1.19. Cost per Foot; 1.20. Temperature Conversion Formulas. | |
| 505 | 8 | |a Chapter Two. Basic Calculations2.0. Capacity, Volumes, and Strokes; 2.1. Slug Calculations; 2.2. Accumulator Capacity; 2.3. Bulk Density of Cuttings (Using Mud Balance); 2.4. Drill String Design (Limitations); 2.5. Ton-Mile (TM) Calculations; 2.6. Cementing Calculations; 2.7. Depth of a Washout; 2.8. Lost Returns--Loss of Overbalance; 2.9. Stuck Pipe Calculations; 2.10. Calculations Required for Placing Spotting Pills in an Open Hole Annulus; 2.11. Pressure Required to Break Circulation; Chapter Three. Drilling Fluids; 3.0. Mud Density Increase and Volume Change. | |
| 505 | 8 | |a 3.1. Mud Weight Reduction with Base Liquid Dilution3.2. Mixing Fluids of Different Densities; 3.3. Oil-Based Mud Calculations; 3.4. Solids Analysis; 3.5. Solids Fractions (Barite-Treated Muds); 3.6. Dilution of Mud System; 3.7. Evaluation of Hydrocyclones; 3.8. Evaluation of Centrifuge; Chapter Four. Pressure Control; 4.0. Normal Kill Sheet; 4.1. Calculations; 4.2. Kill Sheet with a Tapered String; 4.3. Kill Sheet for a Highly Deviated Well; 4.4. Prerecorded Information; 4.5. Kick Analysis; 4.6. Pressure Analysis; 4.7. Stripping/Snubbing Calculations; 4.8. Subsea Considerations. | |
| 505 | 8 | |a 4.9. Workover Operations4.10. Controlling Gas Migration; 4.11. Gas Lubrication; 4.12. Annular Stripping Procedures; 4.13. Worksheet; Chapter Five. Engineering Calculations; 5.0. Bit Nozzle Selection--Optimized Hydraulics; 5.1. Hydraulics Analysis; 5.2. Critical Annular Velocity and Critical Flow Rate; 5.3. The "d" Exponent; 5.4. Cuttings Slip Velocity; 5.5. Surge and Swab Pressures; 5.6. Equivalent Circulation Density (ECD); 5.7. Fracture Gradient Determination--Surface Applications; 5.8. Fracture Gradient Determination--Subsea Applications; 5.9. Directional Drilling Calculations. | |
| 500 | |a 5.10. Miscellaneous Equations and Calculations. | ||
| 506 | |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty | ||
| 520 | |a A quick reference for day-to-day work out on the rig or a handy study guide for drilling and well control certification courses, Formulas and Calculations for Drilling, Production and Workover has served a generation of oilfield professionals throughout their careers. Compact and readable, Formulas and Calculations for Drilling, Production and Workover, 3rd Edition is a problem solving time saving tool for the most basic or complex predicaments encountered in the field. All formulas and calculations are presented in easy-to-use, step-by-step order, virtually all the mathematics required out on. | ||
| 590 | |a Knovel |b Knovel (All titles) | ||
| 650 | 0 | |a Oil wells |x Management |x Mathematics. | |
| 650 | 0 | |a Oil wells |x Management |v Handbooks, manuals, etc. | |
| 650 | 0 | |a Mining engineering. | |
| 655 | 7 | |a elektronické knihy |7 fd186907 |2 czenas | |
| 655 | 9 | |a electronic books |2 eczenas | |
| 700 | 1 | |a Lapeyrouse, Norton J. | |
| 700 | 1 | |a Carter, Thomas. | |
| 776 | 0 | 8 | |i Print version: |a Lapeyrouse, Norton J. |t Formulas and Calculations for Drilling, Production, and Workover : All the Formulas You Need to Solve Drilling and Production Problems. |d Burlington : Elsevier Science, ©2011 |z 9781856179294 |
| 856 | 4 | 0 | |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpFCDPWAF5/formulas-and-calculations?kpromoter=marc |y Full text |