Turnaround, shutdown and outage management : effective planning and step-by-step execution of planned maintenance operations
Shutdown management is project management of a special kind: managing the repair, replacement or maintenance of critical systems. Manufacturing and process plants, computer systems, airliners, and many other systems must be regularly closed down or taken out of service for planned maintenance operat...
Saved in:
Main Author: | |
---|---|
Format: | eBook |
Language: | English |
Published: |
Oxford ; Burlington, MA :
Elsevier/Butterworth-Heinemann,
2006.
|
Edition: | [New ed.]. |
Subjects: | |
ISBN: | 9780080525273 008052527X 9780750667876 0750667877 1281023744 9781281023742 9786611023744 6611023747 |
Physical Description: | 1 online resource (viii, 269 pages) : illustrations |
LEADER | 04737cam a2200469 a 4500 | ||
---|---|---|---|
001 | kn-ocn173507469 | ||
003 | OCoLC | ||
005 | 20240717213016.0 | ||
006 | m o d | ||
007 | cr cn||||||||| | ||
008 | 070929s2006 enka o 001 0 eng d | ||
040 | |a N$T |b eng |e pn |c N$T |d OCLCQ |d TEFOD |d OCLCQ |d OCLCF |d KNOVL |d YDXCP |d LLB |d OCLCQ |d OPELS |d COO |d E7B |d MERUC |d ZCU |d SNK |d IDEBK |d ITD |d TEFOD |d OCLCQ |d AZK |d COCUF |d AGLDB |d STF |d MOR |d PIFAG |d OCLCQ |d U3W |d VNS |d WRM |d D6H |d VTS |d CEF |d RRP |d VT2 |d OCLCQ |d WYU |d JBG |d LEAUB |d M8D |d HS0 |d OCLCQ |d UKCRE |d BOL |d VLY |d OCLCQ |d VHC |d OCLCO |d OCLCQ |d OCLCO |d OCLCL |d EZC | ||
020 | |a 9780080525273 |q (electronic bk.) | ||
020 | |a 008052527X |q (electronic bk.) | ||
020 | |a 9780750667876 | ||
020 | |a 0750667877 | ||
020 | |a 1281023744 | ||
020 | |a 9781281023742 | ||
020 | |a 9786611023744 | ||
020 | |a 6611023747 | ||
035 | |a (OCoLC)173507469 |z (OCoLC)162591606 |z (OCoLC)441792440 |z (OCoLC)507620283 |z (OCoLC)648267342 |z (OCoLC)712976231 |z (OCoLC)856952286 |z (OCoLC)961512669 |z (OCoLC)962725683 |z (OCoLC)984776145 |z (OCoLC)988417776 |z (OCoLC)992080826 |z (OCoLC)1017996925 |z (OCoLC)1034980134 |z (OCoLC)1037701638 |z (OCoLC)1038660714 |z (OCoLC)1055407448 |z (OCoLC)1062923088 |z (OCoLC)1081240759 |z (OCoLC)1103264373 |z (OCoLC)1114479820 |z (OCoLC)1153464466 |z (OCoLC)1162381116 |z (OCoLC)1228573084 |z (OCoLC)1241801339 |z (OCoLC)1290060712 |z (OCoLC)1300681157 |z (OCoLC)1303446544 | ||
100 | 1 | |a Lenahan, Tom. | |
245 | 1 | 0 | |a Turnaround, shutdown and outage management : |b effective planning and step-by-step execution of planned maintenance operations / |c Tom Lenahan. |
250 | |a [New ed.]. | ||
260 | |a Oxford ; |a Burlington, MA : |b Elsevier/Butterworth-Heinemann, |c 2006. | ||
300 | |a 1 online resource (viii, 269 pages) : |b illustrations | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a online resource |b cr |2 rdacarrier | ||
500 | |a Previous edition: published as Turnaround management. 1999. | ||
500 | |a Includes index. | ||
505 | 0 | |a Cover -- Copyright Page -- Contents -- Preface -- Part 1: The Process -- Chapter 1. Turnaround overview: context and strategy -- Chapter 2. Initiating the Turnaround -- Chapter 3. Validating the work scope -- Chapter 4. Pre-shutdown work -- Chapter 5. Contractor packages -- Chapter 6. Planning the Turnaround -- Chapter 7. The Turnaround organization -- Chapter 8. Logistics -- Chapter 9. Cost control -- Chapter 10. The safety plan -- Chapter 11. The quality plan -- Chapter 12. The communications package -- Chapter 13. Executing the Turnaround -- Chapter 14. Terminating the Turnaround -- Part 2: The Model of Excellence -- Chapter 15. Real world application -- Chapter 16. Case study 1 -- Designing an organization -- Chapter 17. Case study 2 -- Work list control -- Chapter 18. Case study 3 -- Contract strategy -- Chapter 19. Case study 4 -- Cost control -- Chapter 20. Case study 5 -- Logistics -- Chapter 21. Case study 6 -- SASOL experiences in cost/risk optimization -- Chapter 22. Summing up -- a reality check -- Appendix: APT-SCHEDULE: Optimizing Shutdowns & Maintenance/Inspection Schedules -- Index -- Last Page. | |
506 | |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty | ||
520 | |a Shutdown management is project management of a special kind: managing the repair, replacement or maintenance of critical systems. Manufacturing and process plants, computer systems, airliners, and many other systems must be regularly closed down or taken out of service for planned maintenance operations. This book provides a complete shutdown project planning guide along with a new, detailed model of excellence and step-by-step project guide. In a critical field, this book shows the maintenance manager or project leader how to get the job done correctly. *Covers all aspects of major maintenance project planning, minimizing downtime and improving maintenance schedules *Covers projects ranging from weekend overhauls through to complete plant rebuilds *With detailed checklists and a new step-by-step project guide. | ||
590 | |a Knovel |b Knovel (All titles) | ||
650 | 0 | |a Industrial management. | |
650 | 0 | |a Plant maintenance. | |
655 | 7 | |a elektronické knihy |7 fd186907 |2 czenas | |
655 | 9 | |a electronic books |2 eczenas | |
700 | 1 | |a Lenahan, Tom. |t Turnaround management. | |
776 | 0 | 8 | |i Print version: |a Lenahan, Tom. |t Turnaround, shutdown and outage management. |b [New ed.]. |d Oxford ; Burlington, MA : Elsevier/Butterworth-Heinemann, 2006 |z 0750667877 |z 9780750667876 |w (DLC) 2007275335 |w (OCoLC)61425611 |
856 | 4 | 0 | |u https://proxy.k.utb.cz/login?url=https://app.knovel.com/hotlink/toc/id:kpTSOMEPS2/turnaround-shutdown-and?kpromoter=marc |y Full text |