High Speed Two (HS2) : infrastructure design and construction. Volume 3, Design and engineering.
The main construction of HS2, Britain's new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and...
Saved in:
| Format | Electronic eBook |
|---|---|
| Language | English |
| Published |
London :
ICE Publishing,
2023.
|
| Subjects | |
| Online Access | Full text |
| ISBN | 9780727766908 |
| DOI | 10.1680/hs2.66892 |
| Physical Description | 1 online resource : illustrations (colour) |
Cover
| LEADER | 00000nam a2200000 i 4500 | ||
|---|---|---|---|
| 001 | em-EDZ0002996427 | ||
| 003 | StDuBDS | ||
| 005 | 20230215134628.0 | ||
| 006 | m o d | ||
| 007 | cr ||||||||||| | ||
| 008 | 230215s2023 enka fob 000|0|eng|d | ||
| 020 | |a 9780727766908 |q ebook | ||
| 040 | |a StDuBDS |b eng |c StDuBDS |e rda |e pn | ||
| 082 | 0 | 4 | |a 385.0941 |2 23 |
| 245 | 0 | 0 | |a High Speed Two (HS2) : |b infrastructure design and construction. |n Volume 3, |p Design and engineering. |
| 246 | 3 | 0 | |a Design and engineering |
| 264 | 1 | |a London : |b ICE Publishing, |c 2023. | |
| 300 | |a 1 online resource : |b illustrations (colour) | ||
| 336 | |a text |2 rdacontent | ||
| 336 | |a still image |2 rdacontent | ||
| 337 | |a computer |2 rdamedia | ||
| 338 | |a online resource |2 rdacarrier | ||
| 500 | |a Also issued in print: 2023. | ||
| 504 | |a Includes bibliographical references. | ||
| 520 | 8 | |a The main construction of HS2, Britain's new zero carbon, high-speed railway, began in September 2020, when delivery activity on Phase One moved from enabling works, scheme design and preparatory work to full construction of the railway. The new railway will link London and the West Midlands and eventually extend services to the North and Scotland. High-speed trains powered by zero carbon electricity will reach speeds of 225mph and transform journey times, while opening up capacity on the existing, conventional railway network. This volume of High Speed Two: Infrastructure Design and Construction from the HS2 Project, contains a collection of papers submitted to HS2 Ltd's Technical Papers Competition. | |
| 588 | |a Description based on online resource; title from PDF title page (viewed on February 15, 2023). | ||
| 610 | 2 | 0 | |a High Speed Two Limited. |
| 650 | 0 | |a High speed trains |z Great Britain. | |
| 650 | 0 | |a Railroad engineering |z Great Britain. | |
| 655 | 7 | |a elektronické knihy |7 fd186907 |2 czenas | |
| 655 | 9 | |a electronic books |2 eczenas | |
| 710 | 2 | |a Institution of Civil Engineers (Great Britain), |e issuing body. | |
| 776 | 0 | 8 | |i Print version : |z 9780727766892 |
| 856 | 4 | 0 | |u https://proxy.k.utb.cz/login?url=https://doi.org/10.1680/hs2.66892 |