Building response to tunnelling case studies from construction of the Jubilee Line Extension London. Vol. 1, Projects and methods : the results of the collaborative research project Subsidence damage to buildings, prediction protection and repair, carried out by Imperial College with the sponsorship of London Underground Limited, CIRIA, the Geotechnical Consulting Group and other industry organisations under the DETR-EPSRC LINK Construction Maintenance and Refurbishment Programme /
The Jubilee Line Extension Project (JLEP) presented a unique opportunity to capture reliable field measurements of the effects of tunnelling on a wide range of buildings. This title is the result of this work.
Saved in:
| Corporate Author | |
|---|---|
| Other Authors | , , |
| Format | Electronic eBook |
| Language | English |
| Published |
London :
Thomas Telford,
2001.
|
| Series | CIRIA special publication ;
200. |
| Subjects | |
| Online Access | Full text |
| ISBN | 9780727745965 |
| DOI | 10.1680/brttcsfcotjlel.30176 |
| Physical Description | 1 online resource (xx, 344p.) : ill., maps. |
Cover
| LEADER | 00000nam a2200000 a 4500 | ||
|---|---|---|---|
| 001 | em-EDZ0000035202 | ||
| 003 | StDuBDS | ||
| 005 | 20170303150546.0 | ||
| 006 | m o d | ||
| 007 | cr ||||||||||| | ||
| 008 | 110624s2001 enkab fo| 000|0|eng d | ||
| 020 | |a 9780727745965 |q (ebook) | ||
| 040 | |a StDuBDS |b eng |c StDuBDS |e pn | ||
| 082 | 0 | 4 | |a 624.193 |2 22 |
| 245 | 0 | 0 | |a Building response to tunnelling |h [electronic resource] : |b case studies from construction of the Jubilee Line Extension London. |n Vol. 1, |p Projects and methods : the results of the collaborative research project Subsidence damage to buildings, prediction protection and repair, carried out by Imperial College with the sponsorship of London Underground Limited, CIRIA, the Geotechnical Consulting Group and other industry organisations under the DETR-EPSRC LINK Construction Maintenance and Refurbishment Programme / |c editors, J.B. Burland, J.R. Standing, F.M. Jardine. |
| 260 | |a London : |b Thomas Telford, |c 2001. | ||
| 300 | |a 1 online resource (xx, 344p.) : |b ill., maps. | ||
| 490 | 1 | |a CIRIA special publication ; |v 200 | |
| 520 | 8 | |a The Jubilee Line Extension Project (JLEP) presented a unique opportunity to capture reliable field measurements of the effects of tunnelling on a wide range of buildings. This title is the result of this work. | |
| 588 | |a Description based on print version record. | ||
| 504 | |a Includes bibliographical references. | ||
| 610 | 2 | 0 | |a Jubilee Line Extension Project. |
| 650 | 0 | |a Buildings |x Effect of nearby construction on |z England |z London. | |
| 650 | 0 | |a Earth movements and building |z England |z London. | |
| 650 | 0 | |a Buildings |x Effect of nearby construction on |x Evaluation. | |
| 650 | 0 | |a Buildings |x Effect of nearby construction on |z England |z London |v Case studies. | |
| 650 | 0 | |a Earth movements and building |z England |z London |v Case studies. | |
| 650 | 0 | |a Tunneling |z England |z London. | |
| 650 | 0 | |a Tunneling |x Safety measures. | |
| 655 | 7 | |a elektronické knihy |7 fd186907 |2 czenas | |
| 655 | 9 | |a electronic books |2 eczenas | |
| 700 | 1 | |a Burland, J. B. | |
| 700 | 1 | |a Standing, J. R. |q (James R.) | |
| 700 | 1 | |a Jardine, F. M. |q (Finlay M.) | |
| 710 | 2 | |a Construction Industry Research and Information Association. | |
| 776 | 0 | 8 | |i Print version : |z 9780727730176 |
| 830 | 0 | |a CIRIA special publication ; |v 200. | |
| 856 | 4 | 0 | |u https://proxy.k.utb.cz/login?url=https://doi.org/10.1680/brttcsfcotjlel.30176 |