Collaborative risk mitigation through construction planning and scheduling : risk doesn't have to be a four-letter word

In the complex, cash-strapped, high pressure world of modern construction, what do you do when something goes wrong? This work looks beyond the best-case scenario to give project managers, contractors, architects and engineers the tools to prepare effectively for the unexpected. Based on the author&...

Full description

Saved in:
Bibliographic Details
Main Author: Coble, Lana Kay, (Author)
Format: eBook
Language: English
Published: Bingley, U.K. : Emerald Publishing Limited, 2018.
Subjects:
ISBN: 9781787431478 (e-book)
9781787432482 (ePUB)
Physical Description: 1 online resource (xix, 152 pages) : illustrations

Cover

Table of contents

LEADER 02880nam a2200397Ii 4500
001 em-9781787431478
003 UtOrBLW
005 20181115125929.0
006 m o d
007 cr un|||||||||
008 181115t20182019enka ob 001 0 eng d
020 |a 9781787431478 (e-book) 
020 . . |a 9781787432482 (ePUB) 
040 |a UtOrBLW  |b eng  |e rda  |c UtOrBLW 
080 |a 69 
100 1 |a Coble, Lana Kay,  |e author. 
245 1 0 |a Collaborative risk mitigation through construction planning and scheduling :  |b risk doesn't have to be a four-letter word /  |c by Lana Kay Coble, ED.D, CPC (Tellepsen Builders, USA). 
264 1 |a Bingley, U.K. :  |b Emerald Publishing Limited,  |c 2018. 
264 4 |c ©2019 
300 |a 1 online resource (xix, 152 pages) :  |b illustrations 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
504 |a Includes bibliographical references and index. 
505 0 |a Prelims -- Introduction -- Has it ever gone as planned? -- Who benefits from planning and how? -- Real construction mitigation case studies -- Risk management matrix -- Communicating the project schedule and change management -- Contingency planning -- Implementing mitigation measures through technological application of the computer scheduling software -- Did your planning meet the desired deadline? -- Appendix -- Definitions -- References -- List of figures & tables -- Index. 
520 |a In the complex, cash-strapped, high pressure world of modern construction, what do you do when something goes wrong? This work looks beyond the best-case scenario to give project managers, contractors, architects and engineers the tools to prepare effectively for the unexpected. Based on the author's more than thirty-five years of construction management experience, the book shows how to proactively mitigate a schedule. It opens with case studies of real life construction mitigation, and goes on to examine the conceptual aspects of anticipating risks and making contingency plans, technical aspects of scheduling, and essential role of communication in change management.Working on the principle that no major project can ever quite go to plan and that "it's not how you start, it's how you finish," Collaborative Risk Mitigation is the ideal complement to traditional scheduling textbooks. 
588 0 |a Print version record 
650 0 |a Construction industry  |x Risk management. 
650 0 |a Production scheduling. 
650 0 |a Strategic planning. 
650 7 |a Technology & Engineering, Construction  |x General.  |2 bisacsh 
650 7 |a Civil engineering, surveying & building.  |2 bicssc 
655 7 |a elektronické knihy  |7 fd186907  |2 czenas 
655 9 |a electronic books  |2 eczenas 
776 |z 9781787431485 
856 4 0 |u https://proxy.k.utb.cz/login?url=https://doi.org/10.1108/9781787431478  |y Full text