The fundamentals of corrosion and scaling for petroleum and environmental engineers

Scale, or deposits, can build up in the wellbore tubulars and other downhole components, causing considerable damage to the life of the well. Infrastructure provides the support for the wells system and with oil and gas consumption on the rise and transportation required to feed that demand, all pet...

Full description

Saved in:
Bibliographic Details
Main Author Chilingar, George V., 1929-
Other Authors Mourhatch, Ryan, Al-Qahtani, Ghazi
Format Electronic eBook
LanguageEnglish
Published Houston, TX : Gulf Pub., c2008.
Subjects
Online AccessFull text
ISBN9780127999913
9781601199713
9780127999906
9781601197733
9781933762302
Physical Description1 online zdroj (xviii, 276 p.) : ill.

Cover

Table of Contents:
  • Cover image; Title page; Table of Contents; PROCESS PIPING DESIGN HANDBOOK; Copyright; Dedication; Foreword; Preface; List of Figures; List of Tables; Chapter 1: Before You Begin; 1.1 Introduction; 1.2 Standards; 1.3 Specifications; 1.4 Procedures; 1.5 Piping Execution Plan; 1.6 Conclusion; Chapter 2: Procedures; 2.1 Introduction; 2.2 Master Stick Files, Working Copies, and Inter-discipline Drawing Reviews (IDR); 2.3 Vendor Drawing Reviews; 2.4 Line Numbering; 2.5 Stress Analysis; 2.6 Model Reviews; 2.7 Checking; 2.8 Manhour Estimating and Manpower Planning; Chapter 3: Deliverables.
  • 3.1 Introduction3.2 Deliverables; Chapter 4: Detailed Design; 4.1 Introduction; 4.2 Contracting and Procurement Plan and Construction Execution Plan; 4.3 Modularized and Field Erected Piping Splits and CWP Boundaries; 4.4 Model Boundaries; 4.5 Shop and Field Material Splits; 4.6 Procurement Splits; 4.7 Issued For Bid and Bid Evaluations; 4.8 Equipment Coordinates and Elevations; 4.9 Module Design; 4.10 Module Numbering; 4.11 Drafting Practice; 4.12 Holds; 4.13 Project Binders and Lists; 4.14 Managing Standard Drawings; 4.15 Project Meetings; 4.16 Progress Monitoring.
  • 4.17 Design Change Notice (DCN)4.18 Field Change Notice (FCN); 4.19 Request For Information (RFI); Chapter 5: Shop Fabrication; 5.1 Introduction; 5.2 Kick-off Meetings; 5.3 Scopes of Work (SOW); 5.4 Instruction to the Fabricator; 5.5 Requests For Information (RFI); 5.6 Visits with the Fabricators; 5.7 Automatic Spool Generation; 5.8 Conclusion; Chapter 6: Field Construction; 6.1 Introduction; 6.2 Support From the Home Office; 6.3 Support in the Field; 6.4 Lessons Learned; 6.5 Safety; Appendix A: Abbreviations; Index.