Construction delays understanding them clearly, analyzing them correctly

Delays in construction projects are frequently expensive, since there is usually a construction loan involved which charges interest, management staff dedicated to the project whose costs are time dependent, and ongoing inflation in wage and material prices. Many techniques are used to analyze delay...

Full description

Saved in:
Bibliographic Details
Other Authors: Trauner, Theodore J.
Format: eBook
Language: English
Published: Amsterdam : Boston : Elsevier ; Butterworth-Heinemann, ©2009.
Edition: 2nd ed.
Subjects:
ISBN: 9780080957142
9781856176774
Physical Description: 1 online zdroj (xvi, 266 pages, [12] pages of plates) : illustrations (some color)

Cover

Table of contents

LEADER 03436cam a2200445 a 4500
001 79754
003 CZ ZlUTB
005 20240911215409.0
006 m o d
007 cr |n
008 100119s2009 ne af s 001 0 eng d
020 |a 9780080957142  |q (ebook) 
020 |a 9781856176774 
035 |a (OCoLC)500831993  |z (OCoLC)413012191  |z (OCoLC)429466637  |z (OCoLC)647777141  |z (OCoLC)780025985  |z (OCoLC)824337876 
040 |a KNOVL  |b eng  |e pn  |c KNOVL  |d YDXCP  |d EBLCP  |d CEF  |d OCLCQ  |d DEBSZ  |d OCLCQ  |d DKU  |d OCLCQ  |d OPELS  |d N$T  |d E7B  |d TFWBL  |d B24X7  |d KNOVL  |d ZCU  |d KNOVL  |d OCLCF  |d OCLCQ  |d KNOVL 
245 0 0 |a Construction delays  |h [elektronický zdroj] :  |b understanding them clearly, analyzing them correctly /  |c Theodore J. Trauner, Jr. [and others]. 
250 |a 2nd ed. 
260 |a Amsterdam :  |b Elsevier ;  |a Boston :  |b Butterworth-Heinemann,  |c ©2009. 
300 |a 1 online zdroj (xvi, 266 pages, [12] pages of plates) :  |b illustrations (some color) 
336 |a text  |b txt  |2 rdacontent 
337 |a počítač  |b c  |2 rdamedia 
338 |a online zdroj  |b cr  |2 rdacarrier 
500 |a Previous edition: Construction delays : documenting causes, winning claims, recovering costs / Theodore J. Trauner, Jr. 
500 |a Additional authors: William A. Manginelli, J. Scott Lowe, Mark F. Nagata, Brian J. Furniss. 
500 |a Includes index. 
505 0 |a Project scheduling -- Types of construction delays -- Measuring delays--the basics -- Delay analysis using bar chart schedules -- Delay analysis using CPM schedules -- Delay analysis using no schedules -- Other analysis techniques--their strengths and weaknesses -- The owner's damages due to delay -- The contractor's damages due to delay -- Home office overhead -- Inefficiency caused by delay -- Acceleration -- Other categories of delay damages -- Determining responsibility for delay -- Risk management. 
520 |a Delays in construction projects are frequently expensive, since there is usually a construction loan involved which charges interest, management staff dedicated to the project whose costs are time dependent, and ongoing inflation in wage and material prices. Many techniques are used to analyze delays. Some of these methods have inherent weaknesses and should be avoided. This book points out the shortcomings of these faulty methods and explains how a delay analysis should be performed. It then describes specifically how the analysis is done with CPM schedules. A explanation of delays and delay. 
590 |a Knovel Library  |b ACADEMIC - General Engineering & Project Administration 
506 |a Plný text je dostupný pouze z IP adres počítačů Univerzity Tomáše Bati ve Zlíně nebo vzdáleným přístupem pro zaměstnance a studenty univerzity 
650 0 |a Construction industry  |x Management. 
650 0 |a Production scheduling. 
650 0 |a Construction projects. 
655 7 |a elektronické knihy  |7 fd186907  |2 czenas 
655 9 |a electronic books  |2 eczenas 
700 1 |a Trauner, Theodore J. 
776 0 8 |i Print version:  |t Construction delays.  |b 2nd ed.  |d Amsterdam : Elsevier ; Boston : Butterworth-Heinemann, ©2009  |z 9781856176774  |w (DLC) 2009008998  |w (OCoLC)313078383 
856 4 0 |u https://proxy.k.utb.cz/login?url=http://app.knovel.com/hotlink/toc/id:kpCDUTCAT3/construction_delays__understanding_them_clearly_analyzing_them_correctly_2nd_edition  |y Plný text 
992 |a BK  |c KNOVEL 
999 |c 79754  |d 79754 
993 |x NEPOSILAT  |y EIZ